How Do I Connect InEight and Dalux?

You connect InEight and Dalux with a CDE integration that moves controlled documents, drawings and models from InEight into Dalux for site use, and returns field records such as inspections and quality documents to InEight. CDE Sync™ links both platforms through dedicated accounts, maps InEight fields to Dalux metadata and logs every transfer.

Why InEight programmes reach Dalux on site

InEight is used by owners and contractors on large infrastructure, energy and resources projects to control documents alongside cost, schedule and contracts. It is often the formal record. Dalux is used by many contractors and subcontractors for BIM viewing on site and field quality assurance. When the record sits in InEight and the crews work in Dalux, approved information has to cross between them every time it changes.

Manual transfer is slow and risky. Documents are exported from InEight and uploaded into Dalux, and quality records come back by email for formal registration. On a programme with thousands of documents, that gap leads to crews working from superseded drawings and quality evidence going missing.

What carries across between InEight and Dalux

CDE Sync™ moves documents and models with their version history and maps InEight fields such as document number, revision, status, discipline and contract references to Dalux metadata. Only documents at the agreed status reach the field. On the return path, nominated Dalux folders are registered in InEight with the fields it requires. Every transfer is logged.

The InEight and Dalux integration pages describe each connector.

How to connect InEight and Dalux, step by step

  • Agree which InEight document types and statuses should reach Dalux.

  • Agree which Dalux records should return to InEight.

  • Request an InEight service account from the project administrator.

  • Arrange a Dalux service account with your Dalux administrator.

  • Connect both platforms in the CDE Sync™ wizard and choose locations on each side.

  • Map InEight fields to Dalux metadata and set the schedule.

  • Run a test with one package, check it on site, then switch on the full flow.

Quality evidence on large programmes

Owners on large programmes need strong quality evidence. Inspection and test plans, hold point releases, test certificates and non-conformance close-outs all form part of the record, and auditors expect to find them in the formal system. When that evidence is captured in Dalux Field, a connection means it reaches InEight automatically, with the right fields, instead of waiting for someone to upload it.

The forward path matters just as much. Construction drawings, procedures and method statements approved in InEight should reach site teams immediately. A connected flow puts each approved revision into Dalux with its status visible, so supervisors can trust what they see. Our article on connecting InEight to other CDEs covers the wider options.

Contract references are worth planning. InEight often structures documents by contract or work package, while site teams in Dalux may organise by area or trade. Agreeing how one maps to the other keeps both views useful.

Once running, the connection is mostly about exceptions. Anything that fails a mandatory InEight field is reported to a nominated person and fixed at source. Because CDE Sync™ is configured through a wizard, new contracts can be added without developer time.

Most programmes start with one contract or area, prove the mapping, then extend to the rest of the works.

Security and data residency

CDE Sync™ streams files directly between InEight and Dalux without storing them, encrypts data in transit and processes it in the Azure region you choose, which suits Australian, North American and European residency requirements. Utopia Digital holds SOC 2 Type II and Cyber Essentials. See the Security Trust Portal and the global data region map.

InEight, Dalux and the Utopiaverse™

An InEight to Dalux connection is part of the Utopiaverse™, the connected record Utopia Digital builds across your platforms. CDE Sync™ keeps the record and the field aligned, CDE Backup™ keeps an independent copy in your own Azure, CDE Migrate™ handles moves onto or off either platform, and CDE Archive™ captures the record at completion. AI Insights searches documents and field records together, with cited answers. See also How Do I Connect InEight and Bluebeam? and How Do I Connect Procore and Dalux?

See InEight and Dalux connected in the monthly live demo, or talk to the team about your project.

Previous
Previous

Why CDE Migration Matters: The Platform Is Temporary, The Record Isn't

Next
Next

ISO 19650 Metadata Compliance Across Multiple CDEs: What the Tools Actually Support